After that, run a few errands and off to home at about 1.00pm as I got appointment with the Curtain Installer. Yah, you heard me right. Not that I shifted to another new house. Its just what we call it UPGRADING, lol. When first moving in, we only do some basic stuff. DH always says do just what we needed which I always disagree. For me, I rather do everything before moving in to avoid any problem later on. So, basically previously we just install normal curtain tracks (got it from IKEA) which we install it ourselves.
I waited for the installer, for almost 2 hours. This is really what we call MALAYSIAN TIME MANAGEMENT. Guess yesterday is really a WAITING DAY for me. Anyhow, I was quite surprise, the installer managed to install everything in 45minutes. Thats fast.
So see the transformation, this is only the Living. Couldnt post the photo in the bedrooms, cos the camera out of battery.
TO
On knitting, I have managed to finish knitting ORANGINA, no photos yet as I need to charge the battery. So, me off to another project, havent started yet but I'm planning this, its the BIAS from the IK Spring 2005 issue.
Hope to get started soon.
3 comments:
you still sound so PO-ed with the events. Chill girl chill..:D
I can sympathize with you. The rubber timings I have with the contractors and their subs are driving me nuts.
The good thing though: I brought my projects along with me and knitted when I wait for their arrival (grin)
Hi Doreen
I don't know if you have checked your e-mails, but I have send you my first package yesterday.
Post a Comment